Analisis Faktor Penyebab Cost Overruns Pada Proyek Konstruksi Pembangunan Rumah Dan Ruko Di Kota Bandung Dan Cimahi
(1) Konsentrasi Manajemen Konstruksi, Magister Teknik Sipil, Universitas Katolik Parahyangan, Bandung, Indonesia
(2) Jurusan Teknik Sipil, Fakultas Teknik, Universitas Katolik Parahyangan, Bandung, Indonesia
(*) Corresponding Author
DOI: https://doi.org/10.25077/jrs.17.1.13-23.2021
Copyright (c) 2021 Alvin Prayogo Soekiman, Anton Soekiman
Abstract
Keywords
Full Text:
PDFReferences
Azhar, N., Farooqui, R. U., & Ahmed, S. M. (2008). Cost overrun factors in construction industry of Pakistan. First International Conference on Construction in Developing Countries (ICCIDC–I), Advancing and Integrating Construction Education, Research & Practice, 499–508.
Chan, A. P. C., Scott, D., & Chan, A. P. L. (2004). Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), 153–155.
Doloi, H. (2013). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), 267–279.
Enshassi, A., Al‐Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126–151.
Famiyeh, S., Amoatey, C. T., Adaku, E., & Agbenohevi, C. S. (2017). Major causes of construction time and cost overruns. Journal of Engineering, Design and Technology.
Febrian, R. (2017). Investigasi faktor penyebab Cost Overruns proyek konstruksi di Indonesia: Perspektif kontraktor. Program Magister Teknik Sipil, Program Pascasarjana Universitas Katolik Parahyangan, Bandung.
Gray, C. F., & Larson, E. W. (2000). Project Management : The Managerial Process.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management & Economics, 15(1), 83–94.
Le-Hoai, L., Dai Lee, Y., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), 367–377.
Memon, A. H., & Rahman, I. A. (2013). Analysis of cost overrun factors for small scale construction projects in Malaysia using PLS-SEM method. Modern Applied Science, 7(8), 78.
Memon, A. H., Rahman, I. A., & Aziz, A. A. A. (2012). The cause factors of large project’s cost overrun: a survey in the southern part of Peninsular Malaysia. International Journal of Real Estate Studies, 7(2), 1–15.
Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. Proceeding of Sixth International Postgraduate Research Conference in the Built and Human Environment, 79–93.
Shebob, A., Dawood, N., Shah, R. K., & Xu, Q. (2012). Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), 688–712.
Soekiman, A., & Syamsuduha, S. (2011). The Implementation Effect Of Aspects Relating To Occupational Safety And Health Program Against Productivity In Construction. EACEF-International Conference of Civil Engineering, 1, 75–82.
Wanjari, S. P., & Dobariya, G. (2016). Identifying factors causing cost overrun of the construction projects in India. Sādhanā, 41(6), 679–693.
Westney, R. E. (1997). The Engineer’s Cost Handbook: Tools for Managing Project Costs. Marcel Decker. Inc.
Jurnal Rekayasa Sipil (JRS)-Universitas Andalas (Unand). ISSN: 1858-2133 (print) & 2477-3484 (online)
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
View JRS-Unand Stats